Find the perfect plan for you
MEP Design Services as per international building code (ibc) |
|||
---|---|---|---|
Service |
Basic Cost (max 2000 Sq.Ft.) |
Additional Cost | Turnaround time |
Mechanical Engineering Services | $1000 - For the first floor | Onward $600/floor | 2 Weeks/Floor |
Electrical Engineering Services | $600 - For the first floor | Onward $400/floor | 2 Weeks/floor |
Plumbing Engineering Services | $750 - For the first floor | Onward $500/floor | 2 Weeks/floor |
Sprinkler Design Services | $500 - For the first floor | Onward $300/floor | 2 Weeks/floor |
Fire Alarm Design | $500 - For the first floor | Onward $300/floor | 2 Weeks/floor |
Shipping Container Design |
$2200 (Area 1 to 2,000 Sq. Ft.) |
- | 2 Weeks |
Franchise Rollout | $4,000 (max area 4,000 Sq.Ft.) | Contact Us | 2 Weeks |
Boiler Replacement | $1000 | - | 2 Weeks |
Lighting COMcheck | $500 | - | 2 Weeks |
Mechanical COMcheck | $500 | - | 2 Weeks |
Mechanical Load Calculation | $500- First floor | Onward $500/floor | 2 Weeks |
Title 24 Calculations | $750 / Per Building | - | 2 Weeks |
Hydraulic Calculations | $750 / hydraulic system | - | 2 Weeks |
Virtual Design Construction Services (VDC) | |||
---|---|---|---|
Service | Basic Cost | Additional Cost | Turnaround time |
Parametric Revit Family | $350 / Per Product | - | 2 Weeks |
CAD to Revit Modeling | Starting $2000 | Contact Us | 2 Weeks |
Clash Detection | $50 / Per Report | - | 2 Weeks |
Clash Resolution | $500 for first 100 clashes | Contact Us | 2 Weeks |
Shop Drawings | $500 / Per sheet | - | 2 Weeks |
Redline / Hand Markup | $750 / Per sheet | - | 2 Weeks |
Value-Added Services | |||
---|---|---|---|
Service | Basic Cost | Additional Cost | Turnaround time |
COVID-19 Resilient Building Report | $4000 - Area (Up to 20,000Sq.Ft.) | Contact Us | 2 Weeks |
Value Engineering and Peer Review | $100 / Per sheet | - | 2 Weeks |
Bill Of Quantities | $600 / Per Trade | - | 2 Weeks |
Benchmarking | $1500 / Per Year | - | 2 Weeks |
NY Benchmarking LL84 | - | 2 Weeks | |
Special Inspections Service | $1000 / Per Inspection | - | 2 Weeks |
Equipment Use Permits | $5000 - Up to 5 Equipment | Contact Us | Designed and filed with DOB in 2 week |
Utility Filing | $1000 / Utility Type (filing fees additional) | - | 2 Weeks |
DIAlux Calculations | $750 | - | 2 Weeks |
PCA - Assessment & Reporting | $1500 - Initial Payment | - | 2 Weeks |
Clearing FDNY Objections | $750 | - | 2 Weeks |
Photometric Analysis | $1250 | - | 2 Weeks |
Electrical Utility Filing in NY | $2000 | - | 2 Weeks |
Sewer Service (SC1) | $6000 | - | 2 Weeks |
Electric Load Letter | $750 /Load letter | - | 2 Weeks |
Backflow Preventer | $4000 | - | 2 Weeks |