Simple Pricing, No Surprises

On Demand Engineering Services Pricing

Find the perfect plan for you

MEP Design Services 

as per international building code (ibc)

Service

Basic Cost (max 2000 Sq.Ft.)

Additional Cost Turnaround time
Mechanical Engineering Services $1000 - For the first floor Onward $600/floor 2 Weeks/Floor
Electrical Engineering Services $600 - For the first floor Onward $400/floor 2 Weeks/floor
Plumbing Engineering Services $750 - For the first floor Onward $500/floor 2 Weeks/floor
Sprinkler Design Services $500 - For the first floor Onward $300/floor 2 Weeks/floor
Fire Alarm Design $500 - For the first floor Onward $300/floor 2 Weeks/floor
Shipping Container Design

$2200 (Area 1 to 2,000 Sq. Ft.)

- 2 Weeks
Franchise Rollout $4,000 (max area 4,000 Sq.Ft.) Contact Us 2 Weeks
Boiler Replacement $1000 - 2 Weeks
Lighting COMcheck $500 - 2 Weeks
Mechanical COMcheck $500 - 2 Weeks
Mechanical Load Calculation $500- First floor Onward $500/floor 2 Weeks
Title 24 Calculations $750 / Per Building - 2 Weeks
Hydraulic Calculations $750 / hydraulic system - 2 Weeks

 

Virtual Design Construction Services (VDC)
Service Basic Cost Additional Cost Turnaround time
Parametric Revit Family $350 / Per Product - 2 Weeks
CAD to Revit Modeling Starting $2000 Contact Us 2 Weeks
Clash Detection $50 / Per Report - 2 Weeks
Clash Resolution $500 for first 100 clashes Contact Us 2 Weeks
Shop Drawings $500 / Per sheet - 2 Weeks
Redline / Hand Markup $750 / Per sheet - 2 Weeks

 

Value-Added Services
Service Basic Cost Additional Cost Turnaround time
COVID-19 Resilient Building Report $4000 -  Area (Up to 20,000Sq.Ft.) Contact Us 2 Weeks
Value Engineering and Peer Review $100 / Per sheet - 2 Weeks
Bill Of Quantities $600 / Per Trade - 2 Weeks
Benchmarking $1500 / Per Year - 2 Weeks
NY Benchmarking LL84   - 2 Weeks
Special Inspections Service $1000 / Per Inspection - 2 Weeks
Equipment Use Permits $5000 - Up to 5 Equipment Contact Us Designed and filed with DOB in 2 week
Utility Filing $1000 / Utility Type (filing fees additional) - 2 Weeks
DIAlux Calculations $750 - 2 Weeks
PCA - Assessment & Reporting $1500 - Initial Payment - 2 Weeks
Clearing FDNY Objections $750 - 2 Weeks
Photometric Analysis $1250 - 2 Weeks
Electrical Utility Filing in NY $2000 - 2 Weeks
Sewer Service (SC1) $6000 - 2 Weeks
Electric Load Letter $750 /Load letter - 2 Weeks
Backflow Preventer $4000 - 2 Weeks