Comparing Ready-Mix Concrete and Site-Mixed Concrete

Written by Anuj Srivastava | 8/2/19 1:00 PM

Concrete is one of the most widely used construction materials, and it is made from three basic components: water, aggregates, and Portland cement. The construction industry uses two main types, which are called ready-mix concrete and site-mixed concrete. Selecting the right type for a project is very important: both types have their own specifications, advantages and disadvantages. While both types are viable in concrete construction, one may be more beneficial than the other depending on project conditions.

Ready-mix concrete is manufactured in a plant and delivered to the construction site in an unhardened and plastic state, ready for use. Ready-mix concrete is sold by volume, usually expressed in cubic meters.

Optimize your building design and construction methods to reduce costs.

Site-mixed concrete is volumetric concrete that is prepared at the construction site, as its name implies. Concrete components are mixed in specific ratios to obtain the desired strength. This method requires using formulas to determine the amount of materials and steps to obtain the desired consistency. Workers must be careful and meticulous with the material’s proportions to avoid any quality issues in the concrete.

Differences Between Ready-Mix and Site-Mixed Concrete

     

Both concrete types are viable in construction projects, but one may have significant advantages over the other depending on project needs. The following table describes some advantages and disadvantages of each type of concrete:

Factor Being Considered

Ready-Mix Concrete

Site-Mixed Concrete

Time

Delivered ready to use and less time-consuming.

Slower process due to multiple steps, formulas and the setting time.

Equipment

Does not require equipment at the construction site.

Requires a weigh batch mixer to make concrete on-site.

Distribution

Can be delivered to multiple sites within a project.

Must be mixed at the exact point of use, to avoid contamination

Recommended Application

High-rise structures

Low-rise structures

Storage Requirements

Does not require additional storage space for raw materials

Requires a controlled storage space, to manage and protect materials like cement and aggregates

Waste

Material waste at the site is minimal

There is some material loss during storage and mixing

Quality

Consistent quality, thanks to an automated and controlled environment.

Continuous supervision is for consistency among batches. Setting time may vary due to inconsistency.

Work force

Skilled labor is required only to pour and compact the concrete.

Requires more man-hours to prepare concrete at the project site.

Material takeoff

Concrete can be calculated as a single item.

Materials must be estimated individually, and their purchase must be planned separately.

Space

Requires a suitable access for the concrete mixer truck.

Requires space for material storage and batch mixers.

Batch Size

Large amounts of concrete can be delivered.

Mixing large amounts of concrete on-site is difficult.

Site location

If the batching plant is located very far from the construction site, the concrete will require retardants and other admixtures to prevent setting. Transportation costs will increase, there may be quality concerns.

Requires the transportation of all materials and mixing equipment to the construction site.

Ready-mix concrete tends to be better for many projects, in spite of its higher cost. Ready-mix concrete offers a higher quality, and variation between batches is minimal when concrete is prepared in a plant environment. Another key factor is the project’s location: transportation requirements partially determine which type of concrete is more suitable for a project.

Ready-mix concrete is normally recommended for large projects that require a high volume. On the other hand, site mixing is a better option for small projects and renovations, where the concrete volume is smaller.