Transforming Ideas Into Exceptional Projects
We deliver value-engineered MEP solutions for all building types with precision and innovation.
Why Choose Us
Success Starts With Choosing the Right MEP Engineer
We are one of the fastest-growing MEP design firms in the franchise construction industry.
- 50 States Licensed
- 50% Faster Turnaround Time
- 90% Customer Retention
- 400+ Brands Designed
Proven Results Backed by Client Experiences
"You guys have been great to work with. It was of course a learning curve at first understanding how things were done and time frames and so forth. There isn’t anything that stands out that I feel is a detriment so I’d give a 10"
-Dahlia Washington
-Dahlia Washington
"I just want to say thank you. Your team has been nothing short of amazing and I'm glad to have started working with you and NY Engineers. Ankit is my main point of contact and is on top of everything, he's great"
-Erik Liepins
-Erik Liepins
6000+
Projects Completed
Problems Faced by Architects Designing Banks in Florida, And How Our MEP Engineers Solve Them
1 NOA (Notice of Acceptance) Confusion & Permit Delays
Problem
- Unclear responsibility between the architect, client, and MEP for NOA fees
- Frequent coordination issues during permit submission
- Delays caused by missing or incorrect NOA documentation
Solution
- Early identification of required NOAs for HVAC, roofing & equipment
- Clear NOA coordination with the architect & owner
- Complete permit-ready documentation to avoid last-minute disputes
- Faster approvals with Florida-compliant submittals
2 EnergyGauge Compliance Failure (FBC-Energy)
Problem
- EnergyGauge is mandatory for Florida permits
- Architects must submit EnergyGauge reports with drawings
- Failed reports lead to permit rejection or major delays
Solution
- EnergyGauge compliance provided at no additional cost
- Accurate HVAC load calculations aligned with FBC-Energy
- EnergyGauge Compliance Report submitted with permit drawings
3 Uneven Air Distribution & Zonal Damper Issues
Problem
- Some bank zones receive excess air, others insufficient
- Hot & cold complaints from staff and customers
- Architects blamed for “poor layout” or “bad planning.”
Solution
- Proper zoning strategy with correctly sized zonal dampers
- Balanced air distribution for teller areas, vaults & offices
- ASHRAE-based airflow calculations for thermal comfort
- Designs that eliminate post-construction comfort complaints
4 Strict Florida Energy & Banking Code Compliance
Problem
- Banks have higher energy scrutiny and security requirements
- Non-compliant HVAC designs trigger plan review comments
- Delays impact bank opening schedules
Solution
- FBC, ASHRAE 90.1 & local AHJ-compliant designs
- Energy-efficient HVAC systems tailored for banking operations
- Reduced plan review comments and faster approvals
5 Coordination Issues Between Trades
Problem
- Conflicts between HVAC, electrical, lighting & security layouts
- Late-stage clashes increase redesign costs
- Architects are forced to manage excessive coordination
Solution
- Fully coordinated HVAC, electrical & plumbing designs
- Clash-free MEP layouts under one roof
- Seamless coordination with architect, GC & bank consultants
- Fewer RFIs and a smoother construction phase
6 Tight Timelines for Bank Openings
Problem
- Delays impact tenant fit-outs and bank launch dates
- Slow MEP turnaround affects the entire project schedule
Solution
- Fast-track MEP design delivery for bank projects
- Permit-ready drawings with minimal revisions
- Responsive engineering support throughout approvals
Trusted by More Than 400+ Brands

