Success Starts With Choosing the Right MEP Engineer

We are one of the fastest-growing MEP design firms in the franchise construction industry.

  • 50 States Licensed
  • 50% Faster Turnaround Time
  • 90% Customer Retention
  • 400+ Brands Designed
Proven Results Backed by Client Experiences
"You guys have been great to work with. It was of course a learning curve at first understanding how things were done and time frames and so forth. There isn’t anything that stands out that I feel is a detriment so I’d give a 10"
-Dahlia Washington
"I just want to say thank you. Your team has been nothing short of amazing and I'm glad to have started working with you and NY Engineers. Ankit is my main point of contact and is on top of everything, he's great"
-Erik Liepins
Fitness MEP Dsign
6000+
Projects Completed
Dotted Line Top

Fitness Center Design Challenges in New York — And How Our MEP Engineers Solve Them

1 Mechanical & HVAC: Variable Occupancy Loads and Complex Zoning Requirements

Problem

  • High and fluctuating occupancy causing peak load uncertainty
  • Multiple zones with different comfort and ventilation needs

Solution

  • Use demand-based ventilation (CO₂ sensors) to modulate outdoor air
  • Provide dedicated HVAC zoning for cardio, studios, locker rooms, and weights

2 Electrical: High Equipment Power Demand and Late Vendor Coordination

Problem

  • High power demand from fitness equipment, AV, lighting, and HVAC
  • Managing dedicated circuit requirements and Late manufacturer data leading to redesign

Solution

  • Coordinate early with equipment vendors for accurate load planning
  • Provide dedicated circuits for cardio equipment
  • Separate panels for equipment, HVAC, lighting, and life safety
  • Include spare conduits and flexible raceways for future upgrades

3 Plumbing: Peak Water and Hot Water Demand Management

Problem

  • Extreme peak water usage in locker rooms and showers
  • Sudden hot water demand during short time windows

Solution

  • Right-size domestic water and sanitary systems using peak demand analysis
  • Use centralized or distributed water heaters with recirculation and mixing valves

4 Fire Protection: Sprinkler Coverage Challenges in High-Ceiling & Exposed Designs

Problem

  • Maintaining sprinkler coverage with high ceilings and exposed designs
  • Code compliance uncertainty due to varying occupancy loads, storage areas, and equipment layouts

Solution

  • Early coordination with architectural layouts to ensure compliant sprinkler spacing
  • Perform code-driven fire protection analysis to confirm hazard classification, sprinkler density, and system requirements early in design

5 Structural & Coordination: Heavy Equipment Loads and Late-Stage Design Changes

Problem

  • Heavy equipment loads and RTU placement on post-tension slabs
  • Frequent late equipment changes from vendors
  • Navigating budget pressures and value engineering impacting performance and acoustic control.

Solution

  • Early structural coordination for major equipment placement
  • Apply performance-focused value engineering based on lifecycle cost analysis

6 Project Execution: Documentation Gaps and Performance Alignment Issues

Problem

  • RFIs and field conflicts due to incomplete documentation
  • Balancing performance, comfort, and operational reliability

Solution

  • Provide detailed MEP drawings and performance criteria
  • Align MEP design with client business goals for comfort, air quality, and reliability

7 Fast-Track Schedules & High Stake Deadlines

Problem

  • Healthcare projects often have aggressive timelines
  • Delays impact patient services, operations, and revenue
  • Architects are under pressure to deliver coordinated permit sets quickly

Solution

  • Fast-track MEP design delivery tailored to project milestones
  • Clear, coordinated drawings ready for permit submission
  • Responsive engineering support during design development and reviews
  • Reduced redesign cycles and smoother construction phases