Your MEP Design Partner — From Concept to Construction
Value-engineered, code-aligned MEP designs that streamline coordination, reduce revisions, and protect design intent.
Why Choose Us
Success Starts With Choosing the Right MEP Engineer
We are one of the fastest-growing MEP design firms in the franchise construction industry.
- 50 States Licensed
- 50% Faster Turnaround Time
- 90% Customer Retention
- 400+ Brands Designed
Proven Results Backed by Client Experiences
"You guys have been great to work with. It was of course a learning curve at first understanding how things were done and time frames and so forth. There isn’t anything that stands out that I feel is a detriment so I’d give a 10"
-Dahlia Washington
-Dahlia Washington
"I just want to say thank you. Your team has been nothing short of amazing and I'm glad to have started working with you and NY Engineers. Ankit is my main point of contact and is on top of everything, he's great"
-Erik Liepins
-Erik Liepins
6000+
Projects Completed
QSR MEP Challenges Architects Face — And How We Solve Them
1 Fast-Track QSR Schedules
Problem
- Extremely short design-to-permit timelines
- Pressure to issue incomplete drawings
- Late MEP inputs delaying submissions
Solution
- Early MEP system planning aligned with architectural layouts
- Permit-ready MEP drawings delivered on fast-track schedules
- Parallel coordination to avoid design bottlenecks
2 Tight Spaces & High Equipment Density
Problem
- Compact QSR footprints with heavy MEP loads
- Limited ceiling heights and congested back-of-house areas
- Frequent clashes between ducts, piping, and structure
Solution
- High-density MEP coordination for tight architectural spaces
- Efficient routing that preserves ceiling heights and layouts
- Clash-aware designs that reduce downstream conflicts
3 Kitchen Exhaust & Health Department Compliance
Problem
- Strict health department reviews for commercial kitchens
- Conflicts between exhaust, makeup air, and architectural layouts
- Late comments requiring redesign
Solution
- Code-aligned exhaust and makeup air design from day one
- Early coordination of hoods, grease ducts, and air balance
- Designs that anticipate health department review requirements
4 Prototype Adaptation for Local Jurisdictions
Problem
- National QSR prototypes not aligned with local codes
- Last-minute revisions during plan review
- Inconsistent MEP standards across locations
Solution
- Adaptation of prototype MEP designs to local requirements
- Consistent documentation across multiple locations
- Faster approvals without compromising brand standards
5 Energy Code & Utility Requirements
Problem
- Stringent energy code compliance requirements
- Utility coordination delays impacting schedules
- Equipment efficiency conflicts during review
Solution
- Energy-code-aligned HVAC and electrical system design
- Early utility coordination to avoid late changes
- Equipment selections that balance efficiency and performance
6 Contractor RFIs & Construction Rework
Problem
- Ambiguous MEP drawings leading to RFIs
- Field changes affecting architectural intent
- Budget and schedule overruns
Solution
- Clear, constructible MEP documentation
- Well-coordinated drawings that reduce RFIs
- Design intent protected through construction
Trusted by More Than 400+ Brands

