Transforming Ideas Into Exceptional Projects
We deliver value-engineered MEP solutions for all building types with precision and innovation.
Why Choose Us
Success Starts With Choosing the Right MEP Engineer
We are one of the fastest-growing MEP design firms in the franchise construction industry.
- 50 States Licensed
- 50% Faster Turnaround Time
- 90% Customer Retention
- 350+ Brands Designed
Proven Results Backed by Client Experiences
"You guys have been great to work with. It was of course a learning curve at first understanding how things were done and time frames and so forth. There isn’t anything that stands out that I feel is a detriment so I’d give a 10"
-Dahlia Washington
-Dahlia Washington
"I just want to say thank you. Your team has been nothing short of amazing and I'm glad to have started working with you and NY Engineers. Ankit is my main point of contact and is on top of everything, he's great"
-Erik Liepins
-Erik Liepins
4000+
Projects Completed
Problems Faced By Architects in CA and How We Solve Them
1
Extended MEP Turnaround Times
- Up to 50% faster design delivery than typical MEP firms
- 2-week turnaround for most MEP design packages
- Code-compliant designs that speed up plan-check approvals
2
Cost and Equipment Estimation
- Value engineered designs to save cost
- Equipment selection to satisfy code requirements
- Coordination among stakeholders to smoothen supply chain
3
Stringent Permitting and Code Requirements (Title 24 & CALGreen)
- Permit-ready MEP designs with Title 24 energy models & CALGreen checklists
- Utility coordination + full submittal package for faster approvals
- All drawings meet city-specific AHJ criteria, helping prevent plan-check revisions and delays.
4
Limited Electrical Capacity in Retail Suites
- Optimized, energy-efficient MEP designs to reduce load and maintain compliance requirement.
- Well-prepared Electric Load Letters + single-line diagrams for AHJ approvals.
- Alternatives: optimized lighting layouts, solar feasibility, staggered HVAC.
5
Responsiveness and Quality of Design
- Less than 24 hours of response time- best in the industry
- Code compliant design that has 80% first time approval
- RFI responses shared within 2 business days
6
Coordination Among Trades and Stakeholders
- Clash free MEP design under one roof
- California and 49 other state licenses to assist your all over US
- Flawless coordination with GC and architect
Trusted by More Than 350 Brands

