EverGreene Architectural Arts - Office Renovation

final_design_forthcoming.png

We have provided professional MEP/FP engineering consultation services for the renovation. Our proposal was based on the correspondence with our office on 06-02-2016. The project consisted of renovating the office space on the 4th and 5th floors. Complete mechanical, electrical, plumbing, fire alarm, and sprinkler drawings suitable for filing and construction for the area shown in building 3 in the attached drawings. The new sprinkler system has been coordinated with new structural openings designed by others. Radiators shown removed or replaced to coordinate with openings.

Location

Industry City, Building 3, NY

Client

MKDA

Budget:

$33400

 

Related Projects

Shirley-Chisholm-State-Office

Shirley Chisholm State Office

Shirley Chisholm was the first African American woman elected to Congress, representing New York’s 12th Congressional district for 7 terms from 1969 to 1983.

View Project

Red-Hook-Water-Pollution-Control-Plant

Red Hook Water Pollution Control Plant

Built in 1987, the Red Hook Water Pollution Control Plant is just one of New York City’s fourteen pollution control centers that treats a combined 1.7 billion gallons of waste per day collected through the approximated 6,000 miles of underground sewage tunnels.

View Project

Newport-PATH-Station

Newport PATH Station

Currently serving over 20,000 riders daily, the Newport PATH station connects northern New Jersey commuters to New York City’s Financial District and the West Village/Chelsea/Herald Square neighborhoods.

View Project

© 2020 New York Engineers. All Right Reserved. Legal Notice | Trademarks