This building located in the Flatiron neighborhood was built in 1909, and includes 9 stories.
NYE provided professional consulting engineering services for the MEP engineering survey and report. The feasibility study was to assess and recommend options, provided preliminary budgets, and identify a project schedule for the installation of a building-wide HVAC system. The system was capable of providing chilled medium to floors 2-9 plus penthouse. The build-out of individual floors’ systems was the responsibility of the individual unit owner, though standards for such completion of the system was included in this report..