We have provided professional MEP/FP engineering consultation services for the renovation. Our proposal was based on the correspondence with our office on 06-02-2016. The project consisted of renovating the office space on the 4th and 5th floors. Complete mechanical, electrical, plumbing, fire alarm, and sprinkler drawings suitable for filing and construction for the area shown in building 3 in the attached drawings. The new sprinkler system has been coordinated with new structural openings designed by others. Radiators shown removed or replaced to coordinate with openings.
At New York Engineers, we search for simple, eloquent solutions to complex problems. We minimize construction costs by eliminating the extraneous and focusing on the overall efficiency for the most streamlined designs.