NYE provided professional MEP engineering consultation services for the renovation. The project consists of renovating the large, single-story manufacturing warehouse with adjoining office space. The warehouse is conditioned by rooftop units and ceiling-hung gas-fired heaters. Portions of the building are heated by a central boiler with two hot water loops and there are multiple split-system units serving the office spaces.
New York Engineers provided MEP/FP engineering services for a gut renovation at the offices.
At New York Engineers, we search for simple, eloquent solutions to complex problems. We minimize construction costs by eliminating the extraneous and focusing on the overall efficiency for the most streamlined designs.