NYE provided professional sprinkler engineering consultation services for the renovation. The project consists of creating demolition drawings for the sprinkler, mechanical, and electrical systems covering 26,000 ft2 of the 15th and 16th floors, as well as temporary sprinkler loop drawings for filing. It also entailed sprinkler demolition drawings for the approximately 500 ft2 on the 17th floor and removal of the rooftop AC unit.