212-575-5300
Tel : (786) 788-0295
info@ny-engineers.com
Carbon Emissions Calculator
Pricing Calculator
Engineering
MEP Design
Mechanical - HVAC
Electrical
Plumbing
Fire protection
Sprinkler Engineering
Fire Alarm
Franchise Design
QSR
Healthcare
Fitness
Retail
Petcare
Banks
Franchise Projects
EV Charging Station Design
Solar Power System Design
Solar Power System Design
Solar Power Feasibility Study
Solar PV System Design
BIM Modeling
CAD to Revit
BIM Family
Energy Audit
P-12 Clean Green Schools Initiative
Whole Building Deep Energy Audit
LL87: Energy Audits
LL84: Benchmarking
All Services
Projects
Hotel
Office
Education
Retail
Restaurant
Residential
Non-Profit
Government
Healthcare
Manufacturing
Passive House
Franchise
Sample Work
On Demand
Electric Load Letter
Hydraulic Calculations
Quantity Takeoff
Photometric Analysis
Title 24 Calculation
Lighting COMcheck
All Services
Resources
Blog
Case Studies
Media Newsroom
About Us
Contact
REQUEST A PROPOSAL
Solar PV and Batteries Will Reach 71% of New US Generation in 2023
VIEW POST
What is Quantity Takeoff in Construction - Methods and Importance
VIEW POST
What Does MEP Mean in Construction?
VIEW POST
Solar PV and Batteries Will Reach 71% of New US Generation in 2023
What is Quantity Takeoff in Construction - Methods and Importance
What Does MEP Mean in Construction?
Home
Blog
Ankit Javeri
Trending Tags:
design
energy efficiency
building code
mep engineering
franchise
solar energy
ev charging station
Ankit Javeri
Ankit is the Project Manager at NY Engineers, who holds an M.Tech. Some of his projects includes Community Access, Jackson Avenue
Recent Posts
Jennifer Kuether, Principal Chicago Engineers Featured on NCTV17
By
Ankit Javeri
1 minutes read
Panic Hardware Requirements for Electrical Room Doors in Chicago
By
Ankit Javeri
4 minutes read
Electrical Room and Infrastructure Requirements for Advanced Metering in Chicago
By
Ankit Javeri
5 minutes read
NFPA 780 & UL Master Label: Lightning Protection System Designs for Chicago Buildings
By
Ankit Javeri
5 minutes read
Locations Where Tamper-Resistant Receptacles are Required in Chicago Buildings (CEC 406.12)
By
Ankit Javeri
4 minutes read
ASHRAE 90.1-2013 vs. IECC 2015: Key Differences in Lighting Control
By
Ankit Javeri
5 minutes read
2018 Chicago Electrical Code 240.87: Acceptable Methods for Arc Energy Reduction
By
Ankit Javeri
4 minutes read
When to Specify a Unit-Mounted Load Bank for Your Generator
By
Ankit Javeri
4 minutes read
2018 Chicago Electrical Code 700.26: A New Look at Surge Protection Devices
By
Ankit Javeri
5 minutes read
Estimating Electrical Load in Chicago Buildings
By
Ankit Javeri
4 minutes read
The future of roof top fire water tanks in Chicago
By
Ankit Javeri
5 minutes read
Fire pump inspection, testing and maintenance in Chicago
By
Ankit Javeri
5 minutes read
2
3
4
Join 15,000+ Fellow Architects and Contractors
Get expert engineering tips straight to your inbox. Subscribe to the NY Engineers Blog below.